Turn the mount over. Attach the right mounting hole of the boost breakout to the center mounting hole of the mount with an M2.5 screw and nut.
Flip the mount back upright. Attach the perma proto board to the two remaining mounting holes with M2.5 screws and nuts. The second mounting hole for the boost breakout should be secured with the screw closest to the USB breakout.
Now would be a great time to double check that your voltage readings on the breakout are still accurate before closing up the enclosure. You should read -12V on the negative rail and +12V on the positive rail.
If you skipped the Tune to +12V and -12V page, please go back to it.
Insert the assembled mounting plate into the enclosure box. The screws will notch into the mounts in the bottom of the box. Attach the toggle switch to the opening in the lid.
Page last edited April 01, 2025
Text editor powered by tinymce.