Hardware for Perma Proto
Use the following hardware to secure the Perma Proto to the bottom cover.
- 4x M3 x 10mm screws
- 4x M3 hex nuts
Install Screws and Nuts
Insert the M3 screws through the bottom mounting holes.
Place the Perma Proto board onto the standoffs with the thread of the screws going through the mounting holes.
Use the hex nuts to secure the Perma Proto board to the bottom cover.
Secured Perma Proto
Inspect the Perma Proto board and 4-pin cable to enclosure none of the wires are being kinked.
Install Frame
Orient the case frame with the bottom cover.
Snap fit the case frame over the bottom cover.
Final Build
Plug in the USB-C cable from the QT Py to a 5V power source.
Congratulations on building the neon sign!
Text editor powered by tinymce.