Wiring — image 1 of 1

feather_edited_P1450493.jpg
details
  1. Slide a piece of heat shrink onto the daisy chain GND and power wires before soldering them to potentiometer 2.
  2. Then, solder the daisy chain GND wire to the GND pin and the power wire to the positive pin.
  3. Solder a wire to the wiper pin.
  4. Solder a new piece of wire to the positive pin and another new piece to the GND pin. These will bring power and ground to potentiometer 1.
Back

Search