Installation — image 2 of 3

led_strips_18_coathanger.jpg
details

Drill two adjacent 1/4" holes in the wall behind where you plan to mount the Circuit Playground, and two more where the connector will emerge to connect with your first LED.  I found it easiest to mount the Circuit Playground directly above the first LED in the series, so gravity and a repurposed coat hanger were the only tools I needed for threading the wires through the wall.

Back

Search